There's no fixed, universally applicable maximum downtime for a Reverse Osmosis system without flushing. It depends on a combination of several key factors. Neglecting flushing could lead to irreversible membrane performance degradation or even failure.

The following are the main factors influencing the permissible downtime:

1. Influent Water Quality:

Microbial Content (bacteria, algae): This is the greatest risk factor. Stagnant water rich in microorganisms can rapidly grow and form biofilms on the membrane surface. Once formed, biofilms are extremely difficult to completely remove, permanently reducing water production and salt rejection. The dirtier the water (such as surface water or wastewater reuse), the higher the risk and the shorter the permissible downtime.

Scaling Propensity (hardness, silica, sulfate, etc.): During downtime, high-concentration salts that remain in the reject stream have ample time to precipitate, forming a hard scale layer (such as calcium carbonate, calcium sulfate, and silica), which can clog the flow paths and membrane surface. The higher the influent scaling propensity, the shorter the permissible downtime.

Organic Matter Content: Dissolved organic matter, when stagnant, may adsorb onto the membrane surface or promote biological growth.

Oxidant Residue (e.g., Residual Chlorine): Even trace amounts of residual chlorine can slowly oxidize polyamide composite membranes (the most commonly used type) over extended periods, damaging the membrane's desalination layer. Ensure that the feed water is oxidant-free.

2. System Temperature:

Temperature is a key driver of microbial growth. Higher temperatures increase the rate of microbial reproduction exponentially. Systems installed in warm environments or during summer months can tolerate significantly shorter downtimes (perhaps only 24-48 hours). Lower temperatures (e.g., <10°C) inhibit microbial activity, allowing for longer downtimes (although caution is advised).

3. Membrane Element Type:

While all Ro Membranes are susceptible to fouling and scaling, different brands and models may have slight differences in their resistance to biofouling and scaling. However, this is not a significant reason to extend downtimes.

1000lph (2) -小.jpg

4. System Design (Dead Volume):

Dead volume water within pressure vessels and piping is a breeding ground for fouling and scaling. Systems with compact designs and minimal dead volume are relatively less risky.

Common Engineering Scenarios:

Low-Risk Scenario: For systems with good pretreatment (e.g., SDI < 3, no residual chlorine), low microbial content (e.g., high-quality groundwater), and low temperatures (<20°C), the maximum downtime should not exceed 72 hours (3 days). This is the relatively safe upper limit recommended by many membrane manufacturers and engineering companies.

High-Risk Scenario: For systems using surface water, wastewater, high microbial activity, high scaling tendency, and high temperatures (>25°C), the permissible downtime may be as short as 24-48 hours, or even shorter. Overnight shutdown without flushing is sometimes not recommended.

Extreme Risk: When processing microbially rich water in hot weather, shutting down for more than 24 hours without flushing can lead to severe biofouling.

Consequences of Downtime Without Flushing:

Biological Fouling: A significant drop in water yield, an increase in differential pressure, possible changes in salt rejection (usually a decrease), and difficulty and limited effectiveness of cleaning.

Scaling: Water yield decreases, differential pressure increases, and salt rejection may increase (because the scale layer blocks ion flow, but overall performance deteriorates). Cleaning becomes more difficult.

Physical clogging: Particle deposition.

Chemical degradation: Membrane damage caused by oxidants is irreversible.

Difficulty and increased cleaning costs: Fouling/scaling that has formed over a long period of time is generally more difficult to clean, requiring stronger chemicals, longer soaking times, and poor results.

Shortened membrane life: Frequent or severe fouling/scaling can significantly shorten the life of membrane elements and increase replacement costs.

Strongly recommended:

Strictly adhere to operating procedures: Regardless of the planned downtime (even if it's only a few hours), a low-pressure, high-flow flush (using RO permeate or pretreated water) is an absolutely mandatory standard operating procedure before the shutdown. The purpose is to displace the high-concentration reject water and contaminants within the membrane housing.

Exceeding Short-Term Outage: If the projected downtime exceeds the aforementioned safe window (generally considered >24-72 hours, depending on the risk), system preservation (sealing) is necessary:

Short-term preservation (several days to a week): After flushing, fill the system with a 1-1.5% sodium bisulfite (SBS) solution and expel air to isolate oxygen and inhibit microbial growth. Regularly monitor the SBS concentration and pH.

Long-term preservation (>1 week): After thoroughly cleaning the system, seal it with a dedicated sealant containing a biocide (such as SBS) and a pH adjuster (to prevent scaling). This requires more stringent management and regular testing/replacement of the sealant.

Restarting: Regardless of sealing, prior to restarting, perform a thorough flush, drain any sealant or stagnant water, and check that the product water quality (conductivity) has returned to normal.